Logo Čegan
Obrázek hlavičky stránky

EU projects

Year 2023-2024
P.n. CZ.01.04.01/01/22_006/0002355
The main goal of the project was to reduce the energy intensity of the technological process of drying plastic granulate at ČEGAN HOLDING, a.s.

Year 2023-2024
P.n. CZ.01.04.01/0.1/22_006/00001389
The goal of the project is to reduce the energy consumption of production by replacing the old, energy-intensive injection molding machine with a new 220t injection molding machine.

Year 2022-2023
P.n. CZ.01.04.01/0.1/22_006/0000117
The company ČEGAN s.r.o. reduced the energy demand by acquiring a new mold by implementing the project.

Year 2023
R.n. CZ.01.1.02/0.0/0.0/20_338/0023930
The aim of the project is to acquire a prototype mold for research purposes. The project

Project co-financed by the European Fund for International Development and the Ministry of Industry and Trade.
Year 2022–2023
R.n. CZ.31.3.0/0.0/0.0/22_005/0000489
The goal of the project is to install a 308.8 kWp photovoltaic power plant. By implementing the project, ČEGAN ENERGIE, Ltd. will increase the production of electricity from renewable energy sources in the Czech Republic.

Year 2021–2022
R.n. CZ.01.3.10/0.0/0.0/20_370/0026421
The aim of the project was to replace the old, energy-intensive form with a new one in terms of production. Form BERA large - 1169

Year 2021–2022
P.n. CZ.01.3.10/0.0/0.0/20_370/0025313
The aim of the project was to replace the old, energy-intensive technology for plastic metallization with a new one. BUHLER vacuum plastic metallization machine, serial number 700248265.

Year 2021–2022
P.n. CZ.01.3.10/0.0/0.0/20_370/0024972
The aim of the project was to replace two old, energy-intensive injection molding machines with two new electric injection molding machines.

Year 2020–2021
P.n. CZ.01.3.10/0.0/0.0/20_370/0023936
The aim of the project was to replace two old, energy-intensive injection molding machines with a new automated workplace, consisting of:

  • ARBURG 820S 4000-3200 injection molding machine
  • 4 units of temperature control units
  • 2 sets of quick clamping units
  • 1 6-axis KUKA KR12 robot
  • Conveyor
  • Ionization device with bar
  • Safety fencing with switches

Year 2019–2020
P.n. CZ.01.1.02/0.0/0.0/18_215/0019027
The aim of the project is to research the thermal conductivity of graphene prepared by plasma reduction of GO layers.

Year 2019–2020
P.n. CZ.01.3.10/0.0/0.0/16_061/0011083
New, energy-efficient technologies were acquired as part of the project.

  • MORETTO drying system
  • REGLOPLAS temperature control units
  • THM 6-6 hot runner controller
  • ARBURG Allrounder 920 S 4500-2100 GOLDEN EDITION injection molding machine
  • KUKA KR16 R2010-2 6-axis robot
  • ALS104 RH label applicator
  • Pallet conveyor
  • Safety fencing

Year 2019–2020
P.n. CZ.01.3.10/0.0/0.0/18_183/0016079
New, energy-efficient technologies were acquired as part of the project.

  • MORETTO drying system
  • Wittmann temperature control units (3 units)
  • Wittmann robot
  • ENGEL Victory 1060/22 injection moulding machine

Year 2016–2020
P.n. CZ.01.1.02/0.0/0.0/15_030/0007363
This project focuses on the international protection of new technical solutions.

Year 2016–2018
P.n. CZ.01.3.10/0.0/0.0/15_010/0002137
This project involves the supply and installation of cooling technology, including distribution systems, throughout the ČEGAN s.r.o. manufacturing facility. Waste heat from production will be used for heating water and space heating.